Wulkuraka - Train Maintenance Facilities electric trains by CCG Architects

Wulkuraka - Train Maintenance Facilities

HOME

/

ALL PROJECTS

/

TRANSPORT & INFRASTRUCTURE

/

/

/

/

Location

Wulkuraka QLD 4305

Client 

Bombardier Transportation

Year 

2014

Status 

Completed

The project involved Architectural concept design and detail design of the proposed electric train maintenance centre developed in sufficient detail to allow the rolling stock/maintainers to obtain a tender price for the construction of the Maintenance Centre for inclusion within their respective tender offers for the supply, delivery and maintenance of 600 cars to Queensland Rail. 


We were then engaged by the shortlisted bidder as  architectural design consultant to undertake the concept design of the New Generation Rolling Stock Train maintenance facilities.


This dedicated Maintenance Centre has been built at Wulkuraka to maintain, service and repair the New Generation Rollingstock (NGR) fleet.


Key features of the centre include:

  • 10 rail roads for stabling, maintenance, repairs and overhauls

  • A dedicated wheel lathe

  • Train lifting jacks

  • 4 fully pitted roads with raised rails

  • Retractable overhead lines and roof gantries

  • Train cleaning and decanting facilities

  • Automated Visual Inspection System (AVIS).

Major Achievements: Delivered the architectural concept design and detail design documentation on time to suit an extremely tight tender program.

Explore other projects 

TRANSPORT & INFRASTRUCTURE

East Lindfield Zone Substation

TRANSPORT & INFRASTRUCTURE

Gosford South Substation

TRANSPORT & INFRASTRUCTURE

Lee St Substation

bottom of page